Humphery Binjour Road

Humphery Binjour Road Remediation Work Completed August 2014

Background

Significant wet weather over recent years has lead to landslips on Humphery Binjour Road. These landslips have resulted in the road being reduced to one lane.

Repairing damage to the road and re-establishing the two lanes will result in unavoidable impacts to flora species with conservation significance. Populations of Pomaderris clivicola and Bertya pedicellata will be directly impacted. The remediation works will result in the removal of four (4) Pomaderris clivicola and eighty-two (82) Bertya pedicellata being removed from the site. These individuals will be translocated to a new location (offset site) in a conservation area on Gurgeena Plateau.

P. clivicola (Photo below) is listed as vulnerable under the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act) and endangered under the Nature Conservation Act 1992 (NC Act). B. pedicellata is listed as near-threatened under the NC Act.

Translocation and Propagation

Individuals of the threatened species will be trans-located to the nominated Offset Site. Translocation of large mature plants will be carried out prior to the disturbance of the site. Both species are being propagated from vegetation and also tissue culture by the University of Sunshine Coast. Over 250 plants in total will be propagated and planted at the offset site.

Offset Management Plan

The nominated Offset Site is on the Gurgeena Plateau, 13 kilometres from the landslip site. The site was selected due to the suitable habitat and land tenure agreements are currently being secured. To meet the State and Federal Clearing Permit conditions, an Offset Management Plan was developed to outline the management procedures to ensure the survival of both species.

The plan is available for viewing by downloading from the links below:

Offset Management Plan

Figure 1 Figure 2

Figure 4

Figure 5

Figure 6 Figure 7

Figure 9

Appendix A

Appendix B

Appendix C_a

Appendix C_b

Appendix D

 

2018 Annual Report – Landslip remediation works at Humphery Binjour Road, Gayndah, Queensland

Appendix A (a) – Ahern Contracting report/s Appendix A (b) – Ahern Contracting report/s Appendix A (c) – Ahern Contracting report/s
Appendix A (d) – Ahern Contracting report/s Appendix B – WBB Environmental report, Photopoint monitoring Appendix C – Sequential Clear and Grub Report, Probuild Civil and AK Earth Environmental Consultants
Appendix D – Journal of Environmental Science and Technology: Case Study Plant Propagation for Environmental Offset Planting: A Case Study of Endangered Pomaderris clivicola and Near-threatened Bertya pedicellata. Katie S. Roberts and Stephen J. Trueman Genecology Research Centre, University of the Sunshine Coast.

 

 

2017 Annual Report – Landslip remediation works at Humphery Binjour Road, Gayndah, Queensland

Appendix A (a) – Ahern Contracting report/s Appendix A (b) – Ahern Contracting report/s Appendix A (c) – Ahern Contracting report/s
Appendix A (d) – Ahern Contracting report/s Appendix A (d) – Ahern Contracting report/s Appendix B – WBB Environmental report, Photopoint monitoring
Appendix C – Sequential Clear and Grub Report, Probuild Civil and AK Earth Environmental Consultants Appendix D – Journal of Environmental Science and Technology: Case Study Plant Propagation for Environmental Offset Planting: A Case Study of Endangered Pomaderris clivicola and Near-threatened Bertya pedicellata. Katie S. Roberts and Stephen J. Trueman Genecology Research Centre, University of the Sunshine Coast.
2016 Annual Report – Landslip remediation works at Humphery Binjour Road, Gayndah, Queensland
Appendix A – Sunshine Coast University, Propagation Reports Appendix B – Vegetation Offset Monitoring Appendix C a – Ahern Contracting Report/s
Appendix C b – Ahern Contracting Report/s Appendix C c – Ahern Contracting Report/s Appendix D – Permit to conduct Offset Land Management Activities on Gurgeena State Forest for the purpose of Humphery-Binjour Road Landslip Remediation Offset
Appendix E –Sequential Clear and Grub Report, Probuild Civil and AK Earth Environmental Consultants Appendix F – Environmental Management Plan, Probuild Appendix G – Humphrey Binjour Vegetation Offset Management Plan Amendment Request, North Burnett Regional Council
Appendix H – Humphrey Binjour Vegetation Offset Management Plan Amendment Approval, Department of Environment and Heritage Protection